After much floorboard pulling, I now think I've pretty much mapped out the current heating circuit.
I've attached an image showing the before (current pipe layout) which has the new rad at the top right not connected to anything. As you can see there are currently 3 rads connected off one set of 15mm pipes. This currently works but I don't want to add another to those 15mm pipes.
My plan instead is to T off the 22mm half way round, and bring that across. Then to connect the new rad and one of the other rads to that 22mm branch.
Is this the correct way to do it? Any thoughts or considerations before I plough ahead?
Thanks
I've attached an image showing the before (current pipe layout) which has the new rad at the top right not connected to anything. As you can see there are currently 3 rads connected off one set of 15mm pipes. This currently works but I don't want to add another to those 15mm pipes.
My plan instead is to T off the 22mm half way round, and bring that across. Then to connect the new rad and one of the other rads to that 22mm branch.
Is this the correct way to do it? Any thoughts or considerations before I plough ahead?
Thanks