• Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.

Protecting Brickwork under DPC

Joined
4 Nov 2013
Messages
399
Reaction score
12
Country
United Kingdom
Our front elevation DPC is considerably higher than the level of the grass, we want to level up and raise the height of the soil/grass up to one brick below the double brick DPC.

While moving soil around I noticed some of the pointing was in poor condition.

I want to improve this before I shove soil back up against it. The pointing I am fine with but I was thinking... what else could I do to protect the brickwork below the DPC? Membrane behind the soil? ....is it important?

Ideas welcome please. Sorry about focus on the image

View media item 81759
 
There's little you can do to 'protect' brickwork below the dpc.

If you cover it with a membrane, that will only serve to trap water against the brick and make matters worse.

Ideally, bricks below dpc should be frost-resistant. Any poorer-quality bricks should be at least left exposed so that they can air off. When pointing, keep the mortar softer than the brick.
 
Thanks Tony.

I thought using membrane might be a problem. Is there any type of paintable sealant maybe?

If not I will just point and push soil against wall when dry
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top