My builder forgot to place a wet room shower tray and waste tray (downstairs) before having self-levelling screed poured over UFH-DPM-insulation.
Is it now possible to remove the screed in that area and place the wet room shower tray there?
UFH pipes not underneath area for shower tray. Builder worried about self-levelling screed slab cracking.