Hi Folks
Thanks to this forum I have built and 1st coat rendered a concrete block wall with a water feature in it. The info on here has been indispensable - so thank you to all who have posted.
I was wondering how long you wait between scratch coat and second/final coat - What should the consistency of the final coat be - runnier than the scartch coat?
Gary
Thanks to this forum I have built and 1st coat rendered a concrete block wall with a water feature in it. The info on here has been indispensable - so thank you to all who have posted.
I was wondering how long you wait between scratch coat and second/final coat - What should the consistency of the final coat be - runnier than the scartch coat?
Gary

