Rendering/dashing

Joined
17 May 2009
Messages
1
Reaction score
0
Country
United Kingdom
When constructing external wall of extension and foundations:

1.
How do you plaster/dash wall when it is flush with party wall, or is there a need to render/dash the lower portion of the newly built wall,that is the bit that remains below the party wall ?

2.
Sewer pipe from 2nd floor toilet runs directly inline with the proposed new external wall on first floor then into main sewers at ground level. Does the sewer pipe need to be moved inside the line of the new foundations.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top