I am currently prepping my house for a complete renovation. The floors upstairs are concrete, approx 2in thick, over a timber lath (not sure if this is the correct terminology!). Beneath this are the joists and the plasterboard ground floor ceiling, both of which (where visible) appear to be in good nick. The concrete is cracked in numerous places and I want to remove the concrete and, if needed, get someone to hang new floor joists & flooring.

I want to make our budget stretch as far as possible and am looking to do the donkey work (stripping out kitchen, bathrooms, existing wiring, pipework, skirting etc.) myself, rather than pay for labour.

My question is; am i going to endanger myself and or the structural integrity of the house by taking up the concrete. I assume the concrete is no more structural than any other type of flooring?

As an aside, I will be fitting internal insulation onto solid brick walls (currently skimmed and painted) as part of the renovation. All the walls have high damp readings. Does the existing plaster always need to be removed prior to fitting insulation or does it depend on which system of insulation is being installed afterwards?

Thanks in advance
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top