Hi all,
Basically am looking to convert a small room (currently a wc) into a3rd bedroom by stealing some of the 2nd bedrooms space and knocking through a landing cupboard. (all the current walls are stud walls). wc waste and water pipes will need to be cut / sealed off under the floorboards.
I've attached a picture of plans and just wondered if any one can give me a rough guide price. basically all i want to have to do myself is paint the walls when finished. also how long do you think it should take?
http://media.diynot.com/219000_218622_77735_20463021_thumb.jpg
Any advice would be great.
i am in essex.[/img]
Basically am looking to convert a small room (currently a wc) into a3rd bedroom by stealing some of the 2nd bedrooms space and knocking through a landing cupboard. (all the current walls are stud walls). wc waste and water pipes will need to be cut / sealed off under the floorboards.
I've attached a picture of plans and just wondered if any one can give me a rough guide price. basically all i want to have to do myself is paint the walls when finished. also how long do you think it should take?
http://media.diynot.com/219000_218622_77735_20463021_thumb.jpg
Any advice would be great.
i am in essex.[/img]