- Joined
- 29 Jun 2006
- Messages
- 86
- Reaction score
- 0
- Country
Hello,
I'm fitting a shower, and need to run the waste across the room. Is it usual practise to cut holes in the joists and run them under the floorboards? The pipe is 40mm so the holes are going to have to be quite big.
Thanks.
I'm fitting a shower, and need to run the waste across the room. Is it usual practise to cut holes in the joists and run them under the floorboards? The pipe is 40mm so the holes are going to have to be quite big.
Thanks.