Self leveling on tiles

Joined
22 Mar 2007
Messages
1,141
Reaction score
201
Location
Cumbria
Country
United Kingdom
Having removed kitchen units I need to fill where the tiling ends, if I screed this with sand cement, can I then pour self levelling compound over the tiles before fitting new base units.

Will then have floor covered in (SWMBO) will tell me.
 
Sponsored Links
You will need to primer the tiles before you self level screed, assuming there's no residual moisture present etc?
 
Sponsored Links
You will need to primer the tiles before you self level screed, assuming there's no residual moisture present etc?

Prime with?

Whatever screed you are using, will have a suitable primer in the same range, but which primer you use will depend on the different manufacturers specs and the exact nature of the subfloor. Check the F-Ball or Ardex websites.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top