Hi all
Apologies if this is in the wrong forum. I am going to attempt to level my shed floor. It's a combination of tarmac and concrete flags. All in good condition but just looks odd. The area is 3 metres squared. I am thinking of using mapei 3240 for this job which says it covers 6 square meters at 3mm. Therfore in my head I would get 6mm spread out of one bag? However I want to raise the floor a little also...... Maybe an inch all round. There is a slight dip in the middle of about half an inch so I am thinking if i chuck 4 bags at it that would get me 24mm all round in a perfect world.... Take into account the dips and I might end up with say maybe 20mm all round which would be fine. For info the floor is pretty level side to side and back to front. Any advice would be appreciated
Apologies if this is in the wrong forum. I am going to attempt to level my shed floor. It's a combination of tarmac and concrete flags. All in good condition but just looks odd. The area is 3 metres squared. I am thinking of using mapei 3240 for this job which says it covers 6 square meters at 3mm. Therfore in my head I would get 6mm spread out of one bag? However I want to raise the floor a little also...... Maybe an inch all round. There is a slight dip in the middle of about half an inch so I am thinking if i chuck 4 bags at it that would get me 24mm all round in a perfect world.... Take into account the dips and I might end up with say maybe 20mm all round which would be fine. For info the floor is pretty level side to side and back to front. Any advice would be appreciated