- Joined
- 30 Mar 2007
- Messages
- 165
- Reaction score
- 0
- Country

I've got to allow for services to this space before the floors go down etc...
I can get 22m pipe out to kitchen waste via a 4 metre run and 3 90 deg bends. This means a lot of standing water, but am assuming it shouldnt be a problem for blockages because final rinse is usually clear?.
bert
I can get 22m pipe out to kitchen waste via a 4 metre run and 3 90 deg bends. This means a lot of standing water, but am assuming it shouldnt be a problem for blockages because final rinse is usually clear?.
bert