The shaver socket in my bathroom is no longer working and i'm thinking of replacing it. My interpretation of Part P suggests that this is not notifiable. However would it become notifiable if I moved the shaving socket to a new position (within zone 2) in the bathroom and in doing so replaced the old cable?