Hi,
I plan to install a shower, with a 15mm CW supply coming from the floor area, and running up the wall to the shower unit.
Should a double check valve be positioned at the base of the CW supply,
(i.e near the equal tee feed) or near the top just before the shower unit itself..?
Regards,
John
I plan to install a shower, with a 15mm CW supply coming from the floor area, and running up the wall to the shower unit.
Should a double check valve be positioned at the base of the CW supply,
(i.e near the equal tee feed) or near the top just before the shower unit itself..?
Regards,
John