Oh and forwarded email from wife, seems at last will be paid for export.



I don't know about 12-24 hours, but it does have to be cooked and it does have to be cold. But when you think about for how long, and where, fried rice has been a dish, refrigeration wasn't always available, so "cold" probably means "no longer hot".In fact, on a number of occasions I have heard Chinese or other SE Asian 'TV chefs' saying that 'fried rice' should always be made from previously cooked (boiled or steamed) rice that has been stored in a fridge for at least 12-24 hours.

How is that for powering things with electronics in? Like CH boilers?However, as I said early on, although I don't really anticipate any protracted grid power failures, I am prepared for that (so long as I am at home) by having invested £150 in my Lidl generator![]()
It runs my CH system fine, albeit it's all sufficiently old to have little, if any, 'electronics'How is that for powering things with electronics in? Like CH boilers?
Indeed - and, when one considers the rice etc. in Asian 'street food' - although the whole setup initially looks terrifying, it is all wok-heated at extremely high temps the moment before sale (no matter how long it's been sitting in the sun prior to that!) - quite probably at a high enough temp to destroy most toxins, and certainly the bugs that produce themI don't know about 12-24 hours, but it does have to be cooked and it does have to be cold. But when you think about for how long, and where, fried rice has been a dish, refrigeration wasn't always available, so "cold" probably means "no longer hot".
Very much so!It doesn't take long to cook rice from scratch, so those supermarket pouches of microwaveable rice are a bit lazy, but jolly useful if you want to cook fried rice without several hours notice.

So it seems at last I will get paid.Octopus said:Thank you for reaching out!
I wanted to let you know that your export is currently being onboarded, and began on 14/04. It can take up to six weeks for this to be fully onboarded to your account. We appreciate your patience during this process, and if you have any questions or need further assistance, please don't hesitate to ask.
and wonder what will happen when the grid can't take even the small amount of solar power I produce? Clearly, installers should check if the infer structure can take the export, but even in the early days, we saw the battle of the voltage.
How can you yet know that it's 'improving'? The prediction for 'tomorrow' is, indeed, fairly close to the graph for 'today', but until tomorrow comes one cannot tell how good the prediction was, can one?I note changes to software again. .... Seems the prediction is improving.

It all seems like a lot of effort to me - and, if it were me, I suspect I would probably decide that I had better things to do with what time I have left!Storms are forecast, I will see how it does. This has been the problem with solar panels, trying to work out if the energy wants using.


I didn't even know I needed an MPAN export independent to MPAN import until I had moved to Octopus, to start with was with British Gas, and after being told did not need a smart meter, it seems something changed and now one does, so I have an independent export meter, which now does nothing. I had at least two attempts to get a smart meter fitted, may have been three, so 7th September 2023 to 30th January 2024 waiting for smart meter, at which point we were told any export would be back dated, 4th April 2024 went on EV tariff, 8.95p off-peak and 31.31p peak, and this had a £75 exist clause, so locked in for a year. I filled in British Gas forms, but it seemed going around in circles, as they said wrong format, how it was their form.I have switched export off now as I am waiting for an MPAN number from the dreadful SP Networks
is so easy to see what was going on.If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local