Just spent two days removing tiles from a fully tiled bathroom, and the plaster underneath, it was just comming away.
Walls are back to the bare plasterboard, just had a quote to skim it all for £250, all in inc his materials, is this about right?
Bathroom is about 2.6m x 2.4m, standard height and not including the roof.
I was going to attempt myself but as it getting tilled halfway and painted the rest thought it be best to get it done properly.
Thanks
Walls are back to the bare plasterboard, just had a quote to skim it all for £250, all in inc his materials, is this about right?
Bathroom is about 2.6m x 2.4m, standard height and not including the roof.
I was going to attempt myself but as it getting tilled halfway and painted the rest thought it be best to get it done properly.
Thanks