Hi, Im going to be fitting a new ensuite on the third floor of a property, I need to run a new soil stack from the ground floor to the third, there is a discharge pipe running horizontally under the timber floor at ground level that I want to tee into. My concern is how I will be able to do this considering I am going to need a slow bend any suggestions as just a standard tee wont work?