At least the Spanish top people in charge of their train f*ck up had the honour to resign...
"Two top Spanish transport officials have resigned over a botched order for new commuter trains that cost nearly €260m ($275m; £230m).The trains could not fit into non-standard tunnels in the northern regions of Asturias and Cantabria.
The head of Spain's rail operator Renfe, Isaías Táboas, and the Secretary of State for Transport, Isabel Pardo de Vera, have now left their roles. The design fault was made public earlier this month.
The Spanish government says the mistake was spotted early enough to avoid financial loss."
I wonder if any of those involved in the £100bn f*ck up that is HS2 will resign?
More likely they'll get a fast ride to the house of lords!
"Two top Spanish transport officials have resigned over a botched order for new commuter trains that cost nearly €260m ($275m; £230m).The trains could not fit into non-standard tunnels in the northern regions of Asturias and Cantabria.
The head of Spain's rail operator Renfe, Isaías Táboas, and the Secretary of State for Transport, Isabel Pardo de Vera, have now left their roles. The design fault was made public earlier this month.
The Spanish government says the mistake was spotted early enough to avoid financial loss."
I wonder if any of those involved in the £100bn f*ck up that is HS2 will resign?
More likely they'll get a fast ride to the house of lords!