I've converted our bathroom to one complete room from the two rooms it was before.
I'll now be studding up one of the doorways, and it's 99% likely there will be a shower installed on that wall.
Normally I would do the studwork and then plasterboard, but is there a better material/method to use for a surface I'll be tiling onto?
If I skim the plasterboard does it need to be left for so many weeks before it can be tiled over?
I'll now be studding up one of the doorways, and it's 99% likely there will be a shower installed on that wall.
Normally I would do the studwork and then plasterboard, but is there a better material/method to use for a surface I'll be tiling onto?
If I skim the plasterboard does it need to be left for so many weeks before it can be tiled over?