Hi guys,
Just seeking a little advice the best way to do this... I've just got a very small extension shell on the back of the kitchen (3m w x 2m d) I've currently got a concrete base down which was originally there with dpm on top one, it slopes ! One side is 150mm below dpc but the other end is only 100mm( slopes ) this means I've got around 100mm for king span but also means my joists are gonna have to be 100'll but one in will be resting on the dpm?

I really don't want to lay a screed because of the distance to barrow it, I was going originally going to lay 18I'm os b with a 5mm compound, I also don't want to dig the concrete up lol
Is there a,better way to do it?
thanks jake
 
Hi guys,
Just seeking a little advice the best way to do this... I've just got a very small extension shell on the back of the kitchen (3m w x 2m d) I've currently got a concrete base down which was originally there with dpm on top one, it slopes ! One side is 150mm below dpc but the other end is only 100mm( slopes ) this means I've got around 100mm for king span but also means my joists are gonna have to be 100'll but one in will be resting on the dpm?

I really don't want to lay a screed because of the distance to barrow it, I was going originally going to lay 18I'm os b with a 5mm compound, I also don't want to dig the concrete up lol
Is there a,better way to do it?
thanks jake
A 50mm discrepancy over such a short distance? I'd get my best barrow boots on and screed it.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top