Hi Guys, I have a slight dilema with my extension, the guy who poured the concrete footing poured it slightly too high and now im struggling to match up to my existing brickwork level. I now have to either cut loads of bricks or blocks into 45mm thick slithers for my first course ontop of my foundation blocks or buy some ready made thin bricks if such a thing exists??
Any ideas thanks
Any ideas thanks