So I gave it a go with a car trolley jack and a length of 2x4, with a oak plank at the top approx 4ft long and 1" thick to spread the load. Jacked it up and left it for 3 days. Today I screwed it into the joists above held my breath and removed the jack. It's still flat as of 2hrs.. wonder if it'll hold!

Ceiling is being papered and painted in two weeks time. If it hasn't popped by then I reckon I've got away with it..

Cheers
Mike
 
So I gave it a go with a car trolley jack and a length of 2x4, with a oak plank at the top approx 4ft long and 1" thick to spread the load. Jacked it up and left it for 3 days. Today I screwed it into the joists above held my breath and removed the jack. It's still flat as of 2hrs.. wonder if it'll hold!

Ceiling is being papered and painted in two weeks time. If it hasn't popped by then I reckon I've got away with it..

Cheers
Mike

Still holding. :D
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top