I’ve asked in a few sections on this forum so hope I’m not duplicating threads, just asking from a different angle from different trades.
100mm concrete slab going down Thursday late in my build. Was hoping to tile pronto. Got mixed info from 100 days drying before floor tiling to 30 days as that’s when most of the shrinkage has occurred or by using Uzin PE404 or similar after 30 days.
When would tilers be happy to floor tile for a customer on a new slab? Anyone got suggestions other than the Uzin product. Bloody expensive.
100mm concrete slab going down Thursday late in my build. Was hoping to tile pronto. Got mixed info from 100 days drying before floor tiling to 30 days as that’s when most of the shrinkage has occurred or by using Uzin PE404 or similar after 30 days.
When would tilers be happy to floor tile for a customer on a new slab? Anyone got suggestions other than the Uzin product. Bloody expensive.