I know you like pictures so here are some to go with my question.
I have been asking about connecting two ovens and had thought I had 2 CU spaces, but on checking, these appear to be in teh CU controlling the storage heater, which appears to be connected to a timer. We have never used the storage heater and the only time we even tried it was during the day and it didn't work. But, now looking at the CU I am assuming that this CU will only be powered in the economy 7 hours and controlled by the timer. So my questios are
1) Is my assumption correct that the CU will be live as controlled by timer?
2) Who "owns" or is responsible for the timer?
3)We still benefit from cheaper night time electricity on non-storage heater usage, and as we don't need the storage heater, can the CU be changed to be active 24/7?
3) If not any other sensible way I can free up CU space for the new ovens?
Please don't say full re-wire as this is neithr practical nor affordable at the moment.
Timer and CU to storage heater (fuse cover removed)
Input to timer (and rats nest of earths)
CUs, timer and meter (prior to labelling fuses)
No free slots in eitther the white MEM or grey Wylex house CUs
2nd smaller grey Wylex bottom left feeds the outhouse[/img]
I have been asking about connecting two ovens and had thought I had 2 CU spaces, but on checking, these appear to be in teh CU controlling the storage heater, which appears to be connected to a timer. We have never used the storage heater and the only time we even tried it was during the day and it didn't work. But, now looking at the CU I am assuming that this CU will only be powered in the economy 7 hours and controlled by the timer. So my questios are
1) Is my assumption correct that the CU will be live as controlled by timer?
2) Who "owns" or is responsible for the timer?
3)We still benefit from cheaper night time electricity on non-storage heater usage, and as we don't need the storage heater, can the CU be changed to be active 24/7?
3) If not any other sensible way I can free up CU space for the new ovens?
Please don't say full re-wire as this is neithr practical nor affordable at the moment.
Timer and CU to storage heater (fuse cover removed)
Input to timer (and rats nest of earths)
CUs, timer and meter (prior to labelling fuses)
No free slots in eitther the white MEM or grey Wylex house CUs
2nd smaller grey Wylex bottom left feeds the outhouse[/img]