Have a look at these Pictures .. on one side of the trench wall I have dug to accommodate foundations for the garden building I plan to construct in 300mm brick and block there is quite a bit of old brick and rubble .. should I shutter this off before pouring concrete or should I just fill the whole lot?
Also there appears to be the top part of an old wall intact and passing through the width of the trench on another side .. I was just thinking of passing rebar through it in drilled holes and pouring concrete over that as well as opposed to cutting it out .. what do people think?
Also there appears to be the top part of an old wall intact and passing through the width of the trench on another side .. I was just thinking of passing rebar through it in drilled holes and pouring concrete over that as well as opposed to cutting it out .. what do people think?