- Joined
- 14 Aug 2007
- Messages
- 119
- Reaction score
- 0
- Country

The condensate pipe for this is fed through the bottom of the jig but leaves the condensate at a very low level.
I need to have the condensate run into a pump but the connection from the boiler is way to low and would then run up hill to the pump which won't work.
Anyone got any suggestions.
Cheers
I need to have the condensate run into a pump but the connection from the boiler is way to low and would then run up hill to the pump which won't work.
Anyone got any suggestions.
Cheers