Afternoon.
I've just started to grout the tiles around my shower using unibond anti mould power shower grout.
The instructions said 1 part water to 4 parts grout. I used a tub with a line drawn on as a measuring jug, measured the water into a bowl first, then added the grout.
I could literally only get two bowls of grout into the water before it became sooo stiff I could hardly mix it. I didn't tap the power down in the measuring jug etc.
There is no way I could have got another two jugs of powder into the mix. What am I doing wrong?
Any advice massively appreciated.
I've just started to grout the tiles around my shower using unibond anti mould power shower grout.
The instructions said 1 part water to 4 parts grout. I used a tub with a line drawn on as a measuring jug, measured the water into a bowl first, then added the grout.
I could literally only get two bowls of grout into the water before it became sooo stiff I could hardly mix it. I didn't tap the power down in the measuring jug etc.
There is no way I could have got another two jugs of powder into the mix. What am I doing wrong?
Any advice massively appreciated.