I am about to lay some pipes into a channel i've cut into a concrete floor.
x2 sections of 15mm pipe about 0.5 metres long, each connected by a 90 degree elbow to about 2.5 metre length of pipe, forming a C shape.
Could it hold its own weight before i get round to taping over the pipe and concreting it in?
x2 sections of 15mm pipe about 0.5 metres long, each connected by a 90 degree elbow to about 2.5 metre length of pipe, forming a C shape.
Could it hold its own weight before i get round to taping over the pipe and concreting it in?
