Ive just filled a hole in a concrete floor with about 6 inches of concrete. Im about an inch short of floor level, wife is out with car so cant pop out for another bag.
How long do i have before it dries out?
Can i add last inch once its dry?
Or can i finish with some cement later?
Some of it will also have a levelling compound laid later.
Or am i knackered?
If ok should i scuff it up?
How long do i have before it dries out?
Can i add last inch once its dry?
Or can i finish with some cement later?
Some of it will also have a levelling compound laid later.
Or am i knackered?
If ok should i scuff it up?