Valley tiles v Cut valley

Joined
3 Aug 2005
Messages
645
Reaction score
27
Location
Surrey Hills
Country
United Kingdom
In order to get our dormer to fit we have had to reduce the dormer roof pitch from 45deg to 37deg).

The roofer is proposing a cut valley (as valley tiles won’t now work). I am expecting a cost variation for this; not sure how much would be expected.

What are the additional costs (labour & materials) for a cut valley?

The dormers are quite small, we are using standard rosemary tiles.

Thanks.
 

Attachments

  • IMG_2345.JPG
    IMG_2345.JPG
    234.1 KB · Views: 331
Sponsored Links
dont buy the valley tiles and there will be little difference in costs.. unless you use lead in the valleys
 
Sponsored Links
Thanks. Are there any disadvantages of using GRP gulleys?

Is this more labour intensive (and therefore expensive) than valley tiles?
 
Thanks. Are there any disadvantages of using GRP gulleys?
Not the DRY valleys, no. It can be fiddle at the bottom (fascia) whereby you need a lead soaker. No biggie.

Is this more labour intensive (and therefore expensive) than valley tiles?
No. You would probably need to cut your plains into each side of the valley tiles in any case. Plus you have the freedom of gauging up each side independently (with a dry valley) should you need to.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top