Hi - I'm tiling a shower with pebbles on the floor and 200x400 wall tiles and was wondering which should I do first - ie, which goes under/inside the other?
If I put the floor pebbles down first it'll reduce the need to cut the pebbles and give a cleaner edge, but I'll probably need to profile the edge of the wall tiles.
The shower is constructed out of wedi board with all joints sealed as per their method, but I'm expecting to need to run a line of silicon along the joint anyway.
Thanks in advance.
Mac