We are in the process of fitting a small (electric) shower/toilet in our old scullery. The ceiling has been removed and a large velux will go in the roof.
The plan is to terminate the new stud walls that will enclose the washroom at about 2.6m (the length of the plastic wall planks.
Outside the washroom but still in the scullery we want to have the washer & drier powered by a fused spur from outside the scullery in the kitchen.
Does this set-up sound feasible or is our electrician going to say no?
Building starts Monday but the plan for this part is still flexible.
The plan is to terminate the new stud walls that will enclose the washroom at about 2.6m (the length of the plastic wall planks.
Outside the washroom but still in the scullery we want to have the washer & drier powered by a fused spur from outside the scullery in the kitchen.
Does this set-up sound feasible or is our electrician going to say no?
Building starts Monday but the plan for this part is still flexible.
