Just to update here, we changed the plans with the new fitter. Timber frame, ply and now we have access if needed in the future. We did use a pvc fascia to cover the gap which looks great. Routed the shower waste out of the wall similar to the original pic but now has its own dedicated pipe and the basin has its own. No DPC issues as above this and glad all is sorted. Thanks for all of the advice.
