We are currently having an extension built. A raft foundation was installed and the extension has since been constructed and made watertight. However, the floor insulation and screed have not yet been laid, so the internal floor remains at slab level. Following heavy rain yesterday, a substantial amount of water entered between the first course of blocks and the slab. I realise this is below the damp-proof course, but I wondered whether this would be considered normal at this stage of construction.
