Currently laying slabs on a concrete pad and am laying them on 5 sand to 1 cement mix.
Had to take 1 slab up today as it was not right and found that it was not firmly "stuck "to the concrete base even after 2 days. Am I doing it wrong or should I not worry?
Thanks