Good Afternoon all,
I'm looking to employ a registered electrician to rewire my property, however i want some specific setups:
1) each of the lights downstairs i want wired in 2 way (or more) to a relay in a central location,
2) I want spur's available under the stairs for future 12v lighting project
3) I want spur's available in the floor space between the ground and first floor - again for a future 12v lighting project.
I'm assuming this is actually classed as specification rather then design - at least for 2 and 3. But what about the first one? is that classed as specification or design? and ( i understand it will be the elec's discretion) the relay unit that i want at the end of it - so long as it meets bs standard would that be sufficient?
The idea of the relay unit is to allow control from rasperrypi/computer etc at a later date but if i can get the 240v side setup now, no need for any alterations to that side later.
I'm looking to employ a registered electrician to rewire my property, however i want some specific setups:
1) each of the lights downstairs i want wired in 2 way (or more) to a relay in a central location,
2) I want spur's available under the stairs for future 12v lighting project
3) I want spur's available in the floor space between the ground and first floor - again for a future 12v lighting project.
I'm assuming this is actually classed as specification rather then design - at least for 2 and 3. But what about the first one? is that classed as specification or design? and ( i understand it will be the elec's discretion) the relay unit that i want at the end of it - so long as it meets bs standard would that be sufficient?
The idea of the relay unit is to allow control from rasperrypi/computer etc at a later date but if i can get the 240v side setup now, no need for any alterations to that side later.