• Looking for a smarter way to manage your heating this winter? We’ve been testing the new Aqara Radiator Thermostat W600 to see how quiet, accurate and easy it is to use around the home. Click here read our review.

What to fill cavity with inner and outer block work for bifold.

Joined
3 Jan 2025
Messages
3
Reaction score
0
Country
United Kingdom
below pictures of brick work,with regards to the gap in between gap for bifold what shall I fill the cavity as it the same height as exiting floor level
 

Attachments

  • IMG_8697.jpeg
    IMG_8697.jpeg
    607.8 KB · Views: 79
  • IMG_8877.png
    IMG_8877.png
    1.2 MB · Views: 64
As far as I know you should have concrete in the cavity to 6inches below the DPC and cavity closers for the sides.
 
As far as I know you should have concrete in the cavity to 6inches below the DPC and cavity closers for the sides
Yeah I have done this I am just wondering about the floor level cavity ?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top