Good evening to you all. I am new here and as wondering if any of you could settle an argument for me.
The pic shows a very basic monolithic raft foundation. (Steel and thickness's have been omitted from diagram). The concrete is poured on top of DPM that laps up the sides to the upper level of the concrete. When building off this slab, where would you place the DPC? I am not convinced one is required - given that the concrete is lapped in dpm. My old man believes it should go between courses one and two, my son reckons it should go between the slab and the first course.
(4" concrete blocks, single skin detached store room, rendered outside)
The pic shows a very basic monolithic raft foundation. (Steel and thickness's have been omitted from diagram). The concrete is poured on top of DPM that laps up the sides to the upper level of the concrete. When building off this slab, where would you place the DPC? I am not convinced one is required - given that the concrete is lapped in dpm. My old man believes it should go between courses one and two, my son reckons it should go between the slab and the first course.
(4" concrete blocks, single skin detached store room, rendered outside)