Which should I do first tile the walls and then fit shower and cubicle to the tiles or do I fit the shower and screen first and tile to them. It’s a walk in shower 1700 mm longs against two std work walls, which have been plaster boarded. Both walls are good and solid with decent 4x3 studs. How do I ensure I do not get leaks via the tile seal between wall and basin?