Next year we are going for the big one - attic upgrade on 1930s terrace, as our old endowment policy is due!
Anyway we are looking for 4 major jobs :
Job 1 - floor needs strengthing - steel beams passed throuh the roof
Job 2- a velex window installed
Job 3 - roof needs retiling + and insultion of roof space
Job 4 - new staircase to loft
which order would you consider doing the jobs ?
knowing that the tiles would have to come off a couple of rows, to get the beams in , then job 1 first ?