Hello All,
I have a solid oak floor, 18mm thick. It's been down a while now without issue. However, we now need to have 2 walls re-plastered.
I remember reading in the instructions for the flooring that all 'wet trades' should be finished on site and everything should be left for a while to dry out.
What will effect will plastering after have on the floor if any?
TIA.
I have a solid oak floor, 18mm thick. It's been down a while now without issue. However, we now need to have 2 walls re-plastered.
I remember reading in the instructions for the flooring that all 'wet trades' should be finished on site and everything should be left for a while to dry out.
What will effect will plastering after have on the floor if any?
TIA.
