I bought some loft boards the other day, but am finding cables underneath the mass of insulation that sits above the joists. To stop crushing the cables.
I was thinking of cutting small squares (the width of the joist) that I can screw into the joist, then place the boards on top of the squares and screw into them to raise the boards from joists.
Does this seam a reasonable idea?
I was thinking of cutting small squares (the width of the joist) that I can screw into the joist, then place the boards on top of the squares and screw into them to raise the boards from joists.
Does this seam a reasonable idea?