Hi all
I thought I had this sussed but then got myslef confused when trying to wire in the relay next to the wiring centre.
This is what it currently look likes:
(Sorry the pic is upside down)
The wires that you can see coming in at the top left of the picture. From left to right is the pump, mid position valve and cylinder stat.
Having read various posts before but never started one, i know you guys like to know the system set up so this is it:
The boiler is an ideal icos he12, vented cylinder with a Drayton hts3 t/stat, Drayton ma1 mid position valve
Does anyone know which wires I need to pick up on here please to go into the bdr91?
Thanks
I thought I had this sussed but then got myslef confused when trying to wire in the relay next to the wiring centre.
This is what it currently look likes:
(Sorry the pic is upside down)
The wires that you can see coming in at the top left of the picture. From left to right is the pump, mid position valve and cylinder stat.
Having read various posts before but never started one, i know you guys like to know the system set up so this is it:
The boiler is an ideal icos he12, vented cylinder with a Drayton hts3 t/stat, Drayton ma1 mid position valve
Does anyone know which wires I need to pick up on here please to go into the bdr91?
Thanks
