Here's a discussion that came up at work this week. We couldn't reach a decision.
Here's the hypothetical scenario:
You are called to a job to wire a room stat to a combi boiler. The boiler is fed from an existing FCU, and the new stat will be powered from the load terminals.
There is no existing bonding to the gas or water service.
Do the services require bonding before the stat can be installed?
Your thoughts please....
Here's the hypothetical scenario:
You are called to a job to wire a room stat to a combi boiler. The boiler is fed from an existing FCU, and the new stat will be powered from the load terminals.
There is no existing bonding to the gas or water service.
Do the services require bonding before the stat can be installed?
Your thoughts please....