Hi,
I'm planning on extending a current garage lighting circuit that puts on 3 LED lights from dusk till dawn.
I want to light a silver birch at the bottom of the garden (using a 3W LED bulb) so i'm planning on running 40m of 1.5mm SWA back into the garage for this job. Would I need part P approval? I'd terminate the cable on the outside of the garage with a galvanised metal conduit and suitable gland, then link into the current circuit from there
Thanks.
I'm planning on extending a current garage lighting circuit that puts on 3 LED lights from dusk till dawn.
I want to light a silver birch at the bottom of the garden (using a 3W LED bulb) so i'm planning on running 40m of 1.5mm SWA back into the garage for this job. Would I need part P approval? I'd terminate the cable on the outside of the garage with a galvanised metal conduit and suitable gland, then link into the current circuit from there
Thanks.