Just finished laying MOT for my soon to be block paved drive. Before today had about 50-70mm compacted with my 60kg petrol wacker plate. Today I laid another 100mm and compacted with about 5 passes.
I did my best levelling out pre-compaction but it’s still a little bumpy. Not a bad effort though. I was just wondering if more passes tomorrow would be wise or to hire a big super heavy mofo to really stamp the sub base down as I’d hate for it not to be fully compacted and rut over time.
thoughts on whether my compactor is up for the job or what else would be better?
I did my best levelling out pre-compaction but it’s still a little bumpy. Not a bad effort though. I was just wondering if more passes tomorrow would be wise or to hire a big super heavy mofo to really stamp the sub base down as I’d hate for it not to be fully compacted and rut over time.
thoughts on whether my compactor is up for the job or what else would be better?