Is it normal to build an extension and leave the flooring till last ? I've seen this on a number of occasions. How would they ensure and prevent rising damp if the DPM is not installed correctly ? From what I understand, the DPM should be sandwiched into the inner leaf brickwork (image attached), but it is impossible if you've already built the walls.
I can however see the convenience of it though i.e. not having to worry about damaging the DPM.
I can however see the convenience of it though i.e. not having to worry about damaging the DPM.
