Hi,
I’ve just had some trench footings dug and poured at 600mm width, I’ve been told that due to the wall been 10m long there needs to a pier on the internal brickwork 450mm into the building, making the footing not wide enough. Does anybody know if I can extended the footings width to accommodate this pier?
Thanks
I’ve just had some trench footings dug and poured at 600mm width, I’ve been told that due to the wall been 10m long there needs to a pier on the internal brickwork 450mm into the building, making the footing not wide enough. Does anybody know if I can extended the footings width to accommodate this pier?