Subfloor/Joist is higher at the edges of all external facing walls making floor unlevel, rest of the room is flat. I was planning on laying 2.44m x 1.22m sheets of 5.5mm ply in preparation for engineered wood fooring being glued down, is this going to be an issue or do I need to level the subfloor first?
Really strange how it's like this on all the external facing walls, not sure if it's normal? The chipboard is 18mm, I'm thinking the sheets of ply are so big it will make the gap unnoticeable as the floor just has to be flat, not necessarily level for glued down engineering wood flooring?
Thanks