Wondering how you guys would go about drilling this. It's a party wall and has had dry rot issues. You can see the threads.
From what I can tell its x2 walls against each other. It's a 1920s house. Bricks are 110mm thick by 220mm wide.
I am think the tentacles (hyphae) would be up at the back between the walls to. The source of damp has hopefully been resolved.
It says on treatment to stagger holes at a.
downward angle at 230mm centers, so thinking top of each vertical joint. But how often would I do this? Like at every horizontal row? Worried potentially loosing bricks.
Next door they have drilled a few holes cant really see them, and mainly just sprayed the surface by looks.
From what I can tell its x2 walls against each other. It's a 1920s house. Bricks are 110mm thick by 220mm wide.
I am think the tentacles (hyphae) would be up at the back between the walls to. The source of damp has hopefully been resolved.
It says on treatment to stagger holes at a.
downward angle at 230mm centers, so thinking top of each vertical joint. But how often would I do this? Like at every horizontal row? Worried potentially loosing bricks.
Next door they have drilled a few holes cant really see them, and mainly just sprayed the surface by looks.
