The slate would give the first liner something to sit on, but once the space between it and the brick flue has been filled with mortar it will be held in place with that. Nowadays a cement/vermiculite mix is used.
Are you getting a HETAS fitter in to drop a stainless steel liner down and fit the wood burner using a stove pipe?
Are you getting a HETAS fitter in to drop a stainless steel liner down and fit the wood burner using a stove pipe?
